slide 1 slide 1
slide 2 slide 2
slide 3 slide 3
slide 4 slide 4
slide 5 slide 5
slide 6 slide 6
slide 7 slide 7
slide 8 slide 8
slide 9 slide 9
slide 10 slide 10


The Pentagonal Tower - Section L

Office / Author:
ambient


Team and collaborators:
Miha Kerin
Majda Kregar
Edo Ravnikar jr.
France Dacar
Brane Kregar


Location:
Ljubljan, Slovenia


Year of project / completion:
1985 / 1986


Client:
City of Ljubljana


Status (competition, project, completion) and phase:
completion


Tags:
Architecture / Rennovation


Photo:
Miha Kerin


The pentagonal tower gave access to the castle from the Lipnik elevation across a drawbridge. During the prison period of the castle, the wall shell was damaged to such a degree that investigating and uncovering the original state took a long time. After all the stones had been studied one by one, the traces uncovered enabled the reconstruction of the main entrance, the slits and the defensive windows. The windows from the prison period were walled up in the original structure and with the authentic material so that the alterations on the wall,, are unnoticeable.

The pitch of the roof, which was lowered for economic reasons when restored for the purposes of the prison, was heightened again to its original Gothic shape . The wood roofing of the irregular pentagonal shape was drawn with the help of calculations so that it could be crafted in a workshop and assembled directly on the structure without additional cutting (in 1983).

The circumferential passageways on two levels, hung on the roofing, bear evidence of the original two levels. The open space thus created enhances the monumentality of the castle?s principal tower.

This tower was allready presented in the above-depicted fashion in the design competition material (1969) as a renovation sample for the castle. Prof Stele, the jury?s chairman, was fascinated by the freshness of the approach and proposed an award for the proposition and the commission of the project for the castle revitalisation. The difference is that the wood structure in the competition material was coloured red, yet the conservationists did not agree to it when the design was being executed.